Straitstimes.com header logo

Choose edition

Search

singapore

asia

world

opinion

life

business

sport

Visual

Podcasts

SPH Rewards

STClassifieds

Paid press releases

Advertise with us

FAQs

Contact us

 

Road closures

Beefed-up security, crowd control measures, road closures in Orchard Rd for Christmas Eve

Large crowds are expected in the vicinity of Orchard Road on the night of Christmas Eve.
Large crowds are expected in the vicinity of Orchard Road on the night of Christmas Eve.

Bus service adjustments for Standard Chartered Singapore Marathon on Dec 6 and 7

Road closures for the event will affect 39 bus services.
Road closures for the event will affect 39 bus services.

Pipe leak in Kembangan damages traffic light, causes flooding at Changi Road junction

A video posted on TikTok on Oct 12 showed the road being flooded with a brown liquid.
A video posted on TikTok on Oct 12 showed the road being flooded with a brown liquid.

Bangkok sinkhole: Soil entered metro tunnel due to damaged station ceiling, says governor

The collapse occurred near the construction site of the new Vajira Station MRT line, directly in front of Vajira Hospital.
The collapse occurred near the construction site of the new Vajira Station MRT line, directly in front of Vajira Hospital.

LTA tests temporary road markings and longer work hours for underground utility works

ST20250923_202505400438/esroad24/Brian Teo/Esther Loi/*EMBARGO UNTIL SEPT 24, 12AM* Workers removing the stencil for the interim reinstatement marking at a road work site along River Valley Road on Sept 23, 2025. The marking is part of a new trial by the Land Transport Authority (LTA), alerting motorists that they are driving on a temporary surface rather than the road’s permanent state. ST PHOTO: BRIAN TEO
ST20250923_202505400438/esroad24/Brian Teo/Esther Loi/*EMBARGO UNTIL SEPT 24, 12AM* Workers removing the stencil for the interim reinstatement marking at a road work site along River Valley Road on Sept 23, 2025. The marking is part of a new trial by the Land Transport Authority (LTA), alerting motorists that they are driving on a temporary surface rather than the road’s permanent state. ST PHOTO: BRIAN TEO

Section of West Coast Highway to temporarily close from Sept 2 to 5

These closures are needed to facilitate the construction of a new pedestrian overhead bridge near Block 801 West Coast Crescent.
These closures are needed to facilitate the construction of a new pedestrian overhead bridge near Block 801 West Coast Crescent.

NDP 2025: Police reopen all areas in Marina Bay with easing of crowds

Members of the public making their way to Raffles Place MRT station after the National Day Parade on Aug 9.
Members of the public making their way to Raffles Place MRT station after the National Day Parade on Aug 9.

NDP 2025: Public advised to arrive early for parade amid road closures and enhanced security

This year’s parade will span two venues - the Padang and Marina Bay.
This year’s parade will span two venues - the Padang and Marina Bay.

Smooth traffic after Tanjong Katong Road South fully reopens following sinkhole incident

Bus services 36 and 48 plied their usual routes after being diverted for the past week.
Bus services 36 and 48 plied their usual routes after being diverted for the past week.

E-paper

Newsletters

Podcasts

RSS Feed

About Us

Terms & Conditions

Privacy Policy

Need help? Reach us here.

Advertise with us

Download the app

Get unlimited access to exclusive stories and incisive insights from the ST newsroom
Subscribe Placeholder
MDDI (P) 046/10/2025. Published by SPH Media Limited, Co. Regn. No.202120748H. Copyright © 2026 SPH Media Limited. All rights reserved.