PICTURES

Temporary spans planned for fallen US bridge

SEATTLE (AP) - Governor Jay Inslee announced plans to install temporary spans across the Skagit River within weeks after the collapse of a Washington state bridge that was struck by a semi-truck.

Sunday's announcement came a day after the chairwoman of the National Transportation Safety Board called last week's Interstate 5 bridge collapse a wake-up call to the state of safety of the nation's infrastructure and the Saturday destruction of a highway overpass in Missouri that was struck by a cargo train.

The Washington state collapse, caused by a semi-truck carrying an oversize load striking the bridge, fractured one of the major trade and travel corridors on the West Coast. The interstate connects Washington state with Canada, which is about an hour north of Mount Vernon, where the bridge buckled.

After the collapse, semi-trucks, travel buses and cars clogged local bridges as traffic was diverted through the small cities around the bridge. But overall, traffic was flowing as well as expected during the holiday weekend.

"We're going to get this project done as fast as humanly possible," Governor Inslee, a Democrat, said Sunday. "There are no more important issues right now to the economy of the state of Washington than getting this bridge up and running."

Governor Inslee said he hopes the temporary spans, each with two lanes for northbound and southbound traffic, will be finished in about three weeks' time or about mid-June. The spans will be pre-built and trucked to Mount Vernon.

The state plan also calls for a permanent span to be built and competed by autumn, officials said.

Officials say there are remaining inspections to the spans left standing to make sure they are safe to use.

The federal government is expected to cover 100 per cent of the costs of the temporary bridge and 90 per cent the replacement, said state Transportation Secretary Lynn Peterson.

Join ST's Telegram channel and get the latest breaking news delivered to you.