What it should have been

Monday's report, "Changi's Runway 3 works on hold till after air show", said that major works to give Changi Airport a third landing strip have been put on hold until after the Singapore Airshow. Changi Airport Group has clarified that while the lengthening and strengthening of Runway 3 will start after the air show, works to develop a three-runway system have begun and are on track.

A version of this article appeared in the print edition of The Straits Times on December 23, 2015, with the headline 'What it should have been'. Print Edition | Subscribe